Print this Post

Bathroom Remodel

23 03 2004

Bathroom RemodelMisty and I have been delaying our remodel for our upstairs bathroom for approximately three years. Last time we installed new bath tub then we never finished it for long time. The main reason we can’t decide what we really want because we did not like new tub. To make it short and sweet, we finally went ahead and installed another new tub last month. Everything worked out well at this point.

We went to Home Depot and Lowes number of times and purchased many things for remodeling bathroom. It took us approximately 4 weeks to finish our project. We usually spend time on remodeling our bathroom during my day off and well as Misty’s. I think we did pretty good overall.

Take a look what we’ve done so far with our bathroom. Click here to enter gallery.

- Paint walls
- Install new tub
- Replace wonderboard wall around tub
- Install new shower surround walls (3 panels)
- Install new insulations
- Replace new countertop (marble) and cabinet with six doors
- Replace new bath facuet
- Install 12×30 wall cabinet
- Replace carpet
- Replace new medicine cabinet
- Replace toilet seat (white)
- Replace shower post (white)
- all other misc such as caulk, adhesive, some tools, etc.

Start Slide Show with PicLens Lite PicLens

Actions

Informations

No responses to “Bathroom Remodel”

23 01 2006
penis stretcher (14:01:39) :

penis stretcher penis enlargement techniques viagra online medical enlargement penis stretcher do penis enlargement pills work

Leave a comment

You can use these tags : <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

« Back to text comment